Project Update

As the capital campaign gets ready to roll out to the public on June 1, the project team held a conference call with major donors to provide details about the current state of the project.

——–

The Geotechnical and Property surveys have been completed and the Septic documents have been submitted to the state of Indiana.

The Architectural and Engineering Services documents have been signed and submitted to the architect. 

These services include:

  • Schematic Design (building code research; revised drawings if needed; 3-dimensional model of the building; working with the civil engineer)
  • Design Development (more detailed drawings including finishes; details of mechanical, plumbing and electric systems; site plan elevations and grading)
  • Construction Document Phase (prepare documents for bid; review and receipt of approval from Brown County building official for permitting)

Once that is complete, we will move into the Construction Bidding phase and then into Construction.